الشبكات و الاتصالاتNC082-25
Optical Fiber Splicing and Termination
برنامج تدريبي متخصص يجمع بين المعرفة العملية والتطبيق، ويقدمه فريق من الخبراء والمتخصصين.
NC082-25
أهداف البرنامج
- Understand optical fiber cable construction
- Identify fiber types and connectors.
- Apply fiber safety procedures.• Prepare optical cables for splicing.
- Perform high-quality fusion splicing.• Install mechanical connectors and pigtails.
- Organize fibers inside splice closures and ODFs.
- Test splice quality using VFL, Optical Power Meter, and OTDR.
- Troubleshoot common installation problems.
محاور البرنامج
- Module 1 – Optical Fiber Fundamentals
- Duration: 2 Hours
- Theory
- Introduction to optical fiber communication
- Single-mode vs Multi-mode fibers
- Fiber cable construction
- Color coding standards
- Cable types (Indoor, Outdoor, Drop Cable)
- FTTH network overview
- Practical
- Identifying different cable types
- Fiber identification exercises
- Module 2 – Fiber Safety and Tools
- Duration: 2 Hours
- Theory
- Laser safety
- Handling bare fibers
- Cleaning procedures
- Introduction to common tools in fiber splicing and testing.
- Module 3 – Cable Preparation
- Duration: 4 Hours
- Theory
- Cable stripping procedures
- Loose tube preparation
- Buffer tube handling
- Strength member preparation
- Cleaning fibers
- Cleaving principles
- Practical
- Each trainee prepares:
- Indoor cable
- Outdoor cable
- Drop cable
- Loose tube cable
- Module 4 – Fusion Splicing
- Duration: 6 Hours
- Theory
- Fusion splicing principle
- Arc calibration
- Core alignment
- Typical splice losses
- Common splice errors
- Practical
- Each trainee performas:
- 20–30 fusion splices
- Sleeve installation
- Heat shrinking
- Splice tray organization
- Fiber routing
- Acceptance criteria:
- Splice loss <0.05 dB
- Tensile check
- Visual inspection
- Module 5 – Fiber Termination
- Duration: 4 Hours
- Theory
- Connector types (SC, LC, FC, ST)
- UPC vs APC
- Pigtails
- Patch cords
- Fast connectors
- Mechanical splicing
- Practical
- Installation of:
- SC/APC Fast Connector
- SC/UPC Connector
- Pigtail termination
- ODF termination
- Module 6 – Testing and Inspection
- Duration: 4 Hours
- Theory
- Insertion loss
- Return loss
- OTDR basics
- Event interpretation
- Acceptance criteria
- Practical
- Testing using:
- Light Source
- OTDR
- Trainee analyze:
- Bad splice
- Macro bend
- Connector loss
- Fiber break
- Ghost events
- Module 7 – Final Practical Assessment
- Duration: 3 Hours
- Each trainee completes a complete fiber link:
- Prepare cable
- Cleave fibers
- Perform fusion splice
- Install splice protector
- Organize splice tray
- Terminate pigtail
- Install ODF
- Test using Power Meter
- Verify with OTDR
- Produce a simple test report
- Assessment
- Theory Quiz: 20%
- Laboratory Performance: 50%
- Final Practical Exam: 30%
- Target Audience
- FTTH Installation Technicians
- Optical Fiber Splicing Technicians
- Telecom Field Engineers
- OSP/ISP Installation Teams
- Maintenance Engineers
الفئة المستهدفة
- مهندسو وفنيو الاتصالات والشبكات الراغبون في التخصص العملي.
- فنيو تركيب وصيانة ألياف الضوئية (FTTH / FTTX).
- مقاوِلو البنية التحتية والشبكات ومشرِفو المشاريع الميدانية.